Tap Fee Schedule
WATER TAPS | |||
| Size | Flow | Fixtures | Cost |
| 3/4" | 20 GPM | 1-8 units | $ 500.00 |
| 1" | 30 GPM | 9-15 units | $ 525.00 |
| 1-1/2" | 100 GPM | 31-45 units | $ 1,225.00 w/ bypass |
| 2" | 160 GPM | 46-75 units | $ 1,500.00 w/ bypass |
| >2" | Made by utility contractor | ||
| For large taps made by a utility contractor, actual fee is $ 10.00/inch plus labor and equipment. Estimate - $ 250.00 | |||
SEWER TAPS | |||
| Size | Cost | ||
| 4" | $ 500.00 includes cleanout | ||
| >4" | Made by a utility contractor - No Charge ( Must go into a manhole ) | ||
| Made by City - Actual cost of installation ( Must go into a manhole ) | |||
STREET CUTS/BORES | |||
| Size | Cost | ||
| Std. street cuts/bores | $ 200.00 | ||
| Cuts/bores in excess of 30 feet | $ 250.00 | ||
SPECIAL FRONT FOOTAGE FEES | |||
| 8 " sewer on US 301 ( north lane from creek to fairgrounds ) | $ 26.00/ft | ||
| 12 " waterline on Lake Wilson Rd. & London Church Rd. | $ 9.00/ft | ||
| 8 " sewer on Womble Brooks Rd. | $ 12.00/ft | ||
| 8 " water on Womble Brooks Rd. | $ 11.00/ft | ||
| 8 " sewer on NC 58 North ( includes tap fee ) | $ 15.00/ft | ||